home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_5 / V12_520.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  20KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/MbCuYo:00VcJI3q04f>;
  5.           Sat, 10 Nov 1990 02:16:04 -0500 (EST)
  6. Message-ID: <gbCuYIa00VcJE3oE43@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sat, 10 Nov 1990 02:15:33 -0500 (EST)
  12. Subject: SPACE Digest V12 #520
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 520
  15.  
  16. Today's Topics:
  17.        Re: You Can't Expect a Space Station to be Cheap
  18.  
  19. Administrivia:
  20.  
  21.     Submissions to the SPACE Digest/sci.space should be mailed to
  22.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  23.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  24.              tm2b+@andrew.cmu.edu
  25.  
  26. ----------------------------------------------------------------------
  27.  
  28. Date: Thu, 1 Nov 90 22:42:03 -0500
  29. From: "Allen W. Sherzer" <aws@iti.org>
  30. Subject: Re: You Can't Expect a Space Station to be Cheap
  31. Newsgroups: sci.space
  32. Cc: 
  33.  
  34. Couple of things:
  35. 1. Using the LLNL as a Freedom replacement is NOT part of the
  36.    Great Exploration. I am extrapolating how it may be done and
  37.    as such I may solve a problem differently than they do. I think
  38.    these solutions will work but they may not be the solution LLNL
  39.    is looking into.
  40.  
  41. 2. If people are getting bored with this, speak up and we can take it
  42.    to email or perhaps the space-tech list. 
  43.  
  44. In article <6930@hub.ucsb.edu>:
  45. >>Boeing has a long track record of building highly successful
  46. > >aircraft.   LLNL does not have any track record at all in large
  47. > >space systems.
  48. >+ First of all, that is irrelevant.
  49.  
  50. >It is not irrelevant, track record is the SOLE reason Boeing
  51. >receives these kinds of contracts.    Therefore your analogy
  52. >there cannot be applied to LLNL.
  53.  
  54. As Henry pointed out, that is not true with the 707. However, that
  55. is not what I ment. Your line of arguement was:
  56.  
  57. 1. The price of large new engineering projects cannot be predicted
  58.    in advance.
  59. 2. LLNL is a large engineering program
  60. therefore:
  61. 3. The price of LLNL cannot be predicted.
  62.  
  63. You backed this up with reference to several fixed price programs
  64. which didn't work. 
  65.  
  66. I point out that many large engineering programs DO work and thus
  67. that cannot be held against LLNL. The failure of a large scale
  68. engineering program nor more shows LLNL to be invalid than it goes
  69. to show Freedom being invalid.
  70.  
  71. >+Second of all, the LLNL contractors on this DO have a good track
  72. >+record in large aerospace systems.
  73. >So do the Freedom contractors.......
  74.  
  75. So they you should agree that the LLNL approach is just as valid
  76. and likely to work as Freedom?
  77.  
  78. >Don't you think LLNL will go through similar cost increases as
  79. >reality starts to dawn, and the magnitude of the task is truly
  80. >appreciated ?   
  81.  
  82. Do I think it will cost more? Wouldn't suprise me. Will they
  83. be off by a factor of five like Freedom? No I don't think so.
  84. If they are, then their concept won't work.
  85.  
  86. >And in the 2 years I have been working Freedom,
  87. >first element launch has been set at March 1995, and has not
  88. >slipped one day.    And the costs have been reduced, not
  89. >increased.
  90.  
  91. Again, according to the original schedule, Freedom was to be
  92. permanently crewed in 91 (next year) at a cost of $8B. Maybe the
  93. schedules havn't changed, but that doesn't mean they can be met.
  94. Example: Freedom will use 27 Shuttle flights for assembly over
  95. five years. You don't seriously think that can be done do you?
  96. If not, why don't your schedules reflect serious numbers? When will
  97. Freedom management slip the schedule to reflect realistic launch rates?
  98.  
  99. Indeed under the current schedule Freedom cannot be built. Fisher
  100. Price say things will start breaking so fast that all the Shuttle
  101. flights will be needed just for repair. They won't be able to
  102. build anything new.
  103.  
  104. You man not have changed your schedules in two years, that doesn't
  105. make your schedules realistic.
  106.  
  107. > +If LLNL doesn't have an Earth Station in orbit four years after
  108. >+ start costing under $4 billion I will call for it to be killed.
  109. >+ How's that?
  110. >That's OK provided Freedom does not get cancelled in the interim,
  111. >then we get nothing.
  112.  
  113. Nope. If they can't do it within a factor of two of their estimates
  114. then they need to be cut off and start over. Otherwise we will have
  115. what is currently going on: slipping real schedules and a program
  116. which is slowly dying but will take years to die. We can't afoard to
  117. let that happen again.
  118.  
  119. *THAT* will get us nothing.
  120.  
  121. >+Interesting choice of numbers. Freedom was to be ready in about
  122. >+six years with the start of operations next year. We have
  123. >+already spent six years with nothing to show for it (not
  124. >+counting the $8 billion in briefing slides that is).
  125. >Progress is greater than you think.   Breadboard hardware has
  126. >been built and tested, and we are moving into Engineering
  127. >Development units.    
  128.  
  129. Only in the most preliminary sense. They are also years late,
  130. far over budget, and still subject to redesign.
  131.  
  132. >Manufacturing drawings are being released,
  133.  
  134. You haven't even passed PDR yet. How can you release manufacturing
  135. drawings?
  136.  
  137. >although probably not in their final form.  Flight software
  138. >specifications have been written, and coding will start in a
  139. >matter of months (not sure exactly - not my area).   Flight
  140. >article metal bending will begin in 1992 and deliveries of flight
  141. >articles will begin in 1993.  
  142.  
  143. How much of this will be tossed out in the current redesign?
  144.  
  145. >March 1995 first element launch
  146. >date has been unchanged for the last two years.
  147.  
  148. See above. In the entire six year history of the program this
  149. is the only year that date hasn't slipped. As we have seen,
  150. the date may not have slipped on paper, they have all actually
  151. slipped.
  152.  
  153. I'm sorry to be blunt, but your schedules aren't worth the paper
  154. they are printed on.
  155.  
  156. >+ Besides, sources on Freedom say that the budget cuts are the
  157. >+ excuse  not the cause of the redesigns.
  158. >Redesigns would have been necessary with or without budget cuts,
  159.  
  160. Then why is station management blaming the redesign on the cuts?
  161.  
  162. >but the cuts have made them more often and more severe.  And the
  163. >fact that the redesigns have been for political and not technical
  164. >reasons has been very bad for morale.
  165.  
  166. They have been political because NASA didn't listen to Congress
  167. in the design. Congress wanted a microgravity research facility.
  168. NASA smelled pork and started adding everything but the kitchen
  169. sink onto it. It should come as no suprise when Congress says
  170. they don't want to pay for all that other stuff.
  171.  
  172. Question: Congress is mandating that Freedom's dependance on the Shuttle
  173. and unrealistic launch rates end in the next redesign. Is this a political
  174. or technical reason?
  175.  
  176. As for their being no technical reasons, look at the stations
  177. power, weight, and repair budget. Compare them with the current
  178. situation. I would call that a technical reason for redesign.
  179.  
  180. > >dubious qualification prospects and admitting conventional
  181. >> cells woulBd be just as good and less risky;
  182. >But the NiH and solar celss are not space qualified, 
  183.  
  184. Of what use is space qualifying? Yes you need to test components
  185. to see how they will work but 'space qualification' is a subjective
  186. estimation at best. Example: the Shuttle is 'man rated'. Yet it
  187. has a failure rate no better than Titan or Delta.
  188.  
  189. LLNL will qualify their hardware in the exact manner as Apollo
  190. did (and I assume you thought Apollo was OK). Is this more risky?
  191. Absolutely. Exploration and opening up new frontiers always is.
  192. If Columbus and the early new World colonies where run by NASA,
  193. we would never have come over; it would be too expensive.
  194.  
  195. >+ But again, none of these are serious problems. If they work, we
  196. >+advance the state of the art and save money. If they fail, their
  197. >+weight budgets and schedules allow for it.
  198. >No it is worse, if they fail and Freedom is cancelled, we waste
  199. >decades, it will take that long to rebuild a manned space
  200. >program.
  201.  
  202. We have already wasted a decade. Freedom will take at least
  203. another decade (minimum) to get off the ground. If you use
  204. realistic Shuttle numbers, it will take another decade still
  205. to build it. Why is Freedom worth three decades?
  206.  
  207. In half the time it took to get Freedom up we went from nothing but
  208. Redstones to a man on the moon. In a quarter of the time needed for
  209. Freedom (and a third the cost) we built Skylab. I'm not saying that
  210. putting a space station in orbit is trivial but I am saying it is a 
  211. lot easier than Freedom makes it seem.
  212.  
  213. >> station cannot go up in the HLV with the crew following in the
  214. >> Shuttle or on a (safer and cheaper) Delta.
  215. >Oh come on, the Delta is an unmanned ELV, there are no manned
  216. >spacecraft designed to fly on delta.   And developing a new
  217. >manned spacecraft is not cheap.  Don't tell me that has been
  218. >factored into the cost too.
  219.  
  220. Yep it has. Tell me, in 90 $$ how much does an Apollo capsule
  221. cost?
  222.  
  223. >But again, Titan is expensive, no cheaper than shuttle.   
  224.  
  225. Titan is a hell of a lot cheaper then a Shuttle. An expensive Titan
  226. launch costs maybe $200M. A Shuttle launch is $500M to $1B just for
  227. operational costs. If you want to add in amortization of the Shuttle
  228. development and production costs, tack on anohter $100M or so.
  229.  
  230. >Don't tell me they have included costs of Titans in their plan.  This
  231. >really is getting very far fetched.
  232.  
  233. Why is planning for contingencies far fetched? Two Titan launches as a
  234. backup would add $400M (half the cost of a single Shuttle flight) to
  235. their budget. I don't know if they have planned for it or not but
  236. compared to Freedom cost overruns, this would be minor indeed.
  237.  
  238. >+ It is only good engineering to have a backup for all the
  239. >+methods and technology you plan to use. I always do.
  240. >I agree 100 %, no 1000 %.    
  241.  
  242. Then why did you defend Freedom's refusal to use other launchers which
  243. are cheaper and have a better track record?
  244.  
  245. >It is the COST I am disputing, not so much the technical approach.
  246.  
  247. Again, can you be more specific? When McDonnell Douglas says they
  248. can cluster Deltas to lift a 100K pound payload for $500M in three
  249. years on what do you base your belief that it can't be done? When
  250. Martin Marrietta makes similar claims about the Titan, why are they
  251. wrong? What error in costing did they make?
  252.  
  253. >Wrong again.   Titan is no cheaper than Shuttle.    
  254.  
  255. See above. A Shuttle launch costs two to four times as much as a
  256. Titan launch.
  257.  
  258. >Delta is too
  259. >small too launch the LLNL package, so requires a complete
  260. >redesign which cancels out the launch cost saving.
  261.  
  262. No it doesn't. They replace one of the module connectors to the
  263. airlock with a docking port. Then put three modules in one Titan
  264. and the other three modules (with the airlock) in another. Launch both
  265. from separate Titan's and have them dock in orbit automatically
  266. (the Soviets do this all the time).
  267.  
  268. Cost: An extra $400M for the launches and $1M or so to add the docking
  269. port. We will also need to licence the automatic docking technology
  270. from the Soviets but I figure that's in the noise level.
  271.  
  272. >A single Titan-IV launch gives you a tiny space station.   More
  273. >like a MIR than a Freedom.    
  274.  
  275. See above. However, I should point out that there is a LLNL design
  276. which goes up on a single Titan IV. It has only four modules.
  277.  
  278. >MIR is a lot cheaper than LLNL.
  279.  
  280. Could be but I would like to see that number justified better.
  281.  
  282. >The whole point of Freedom is its size and capability. LLNL gives
  283. >all that away.
  284.  
  285. Nope. The LLNL design has three times the interior room of Freedom
  286. (those inflatables get big). If you factor in room per $$ LLNL
  287. is an even bigger winner. You could launch over 50 LLNL stations
  288. for the cost of one Freedom and you could do it ten years before
  289. Freedom is finished.
  290.  
  291. > + That means there is about a 50% chance that Freedom will never
  292. > +be built. I consider a 50% chance of failure high risk.
  293. >I will not dispute those probabilities, other people arrive at
  294. >different numbers.    
  295.  
  296. Think of how long the Shuttle has spent grounded. Over a third
  297. of it's operational life has been spent unable to fly.
  298.  
  299. >The point of failure rate predictions like
  300. >that is as an inspiration to work on the causes and fix them.
  301. >That is why the number was generated.   You don't just close your
  302. >eyes and pray...!   Reliability predictions are design tools, not
  303. >forecasts of doom.
  304.  
  305. Agreed. What has NASA done to try and fix these numbers? NASA tried
  306. to squash the first Fisher Price study. In fact, Fisher & Price where forced
  307. to do the study 'on the sly' because NASA didn't want them to do it.
  308. They also tried to sit on the second study as well. A source working
  309. on Freedom was almost fired for providing accurate numbers on
  310. weight and power. You yourself implied that you thought you would get
  311. into trouble if you invited Dr. Wood down. When Congress pointed out
  312. that NASA was assuming unrealistic launch rates for the Shuttle NASA
  313. insisted it wasn't a problem. When OTA pointed out that there was a 50%
  314. chance of loosing an orbiter during assembly, NASA shut its eyes and
  315. said no changes where needed.
  316.  
  317. These problems are being worked. However, they are being worked because
  318. Congress and not NASA is demanding it. 
  319.  
  320. > The point is you are not able to quote probabilities for LLNL
  321. >because there is no meaningful test data and hence no failure
  322. >rate data, so a responsible engineer has to assume high failure
  323. >rates until proven otherwise.  
  324.  
  325. Which is why all the hardware will be tested in the exact
  326. same manner as Apollo.
  327.  
  328. > For some reason which I do not
  329. >understand, you seem to assume the failure rates for LLNL will be
  330. >low.   
  331.  
  332. I assume failure rates will be low because the design allows for major
  333. failure without loss of crew. I'm sure their testing will find lots of
  334. problems. That's what tests are for.
  335.  
  336. >Such "ass-backwards" thinking reminds me of Challenger
  337. >"We got away with launching in cold weather twice, so this gives
  338. >us confidence we will get away with it again...."   It reflects a
  339. >fundamental failure to understand the statistical basis of
  340. >reliability predictions, and how to use the numbers generated.
  341.  
  342. Why don't you do a risk analysis of LLNL? Hell, write a white paper
  343. to NASA and propose just that.
  344.  
  345. > >With one exception, I would like to see an ACRV added to
  346. > >the program to get some independence from the Shuttle.
  347. >+ How does that make them independant of the Shuttle?
  348. >It makes the crew in orbit able to get back.   It does not of
  349. >course prevent the SSFP from re-entering.
  350.  
  351. Of course you are still dependant on Shuttle for assembly. How do
  352. you justify that risk and expense? ACRV by no means makes you
  353. independant of the Shuttle.
  354.  
  355. >+ If you want to know how much it costs, you do.
  356. >I do not understand.
  357.  
  358. Since we are comparing two options it would be nice to know how much
  359. each costs. The Shuttle is filled with hidden subsidies which makes
  360. it harder to estimate the true cost of Freedom.
  361.  
  362. > >No, it does not.  NASA is prohibited by Executive Order from
  363. > >competing with the commercial ELV industry.
  364.  
  365. >+Ah but it does. It takes buisness away and costs the taxpayers
  366. >+ billions.
  367.  
  368. >Are you saying Freedom should be launched on commercial ELV ? 
  369.  
  370. Since it would provide more reliable transport at half the cost
  371. I think it wold be a good idea, yes.
  372.  
  373. >I have no real problem with that.   Would require several dozen
  374. >Titan-3 launches.  
  375.  
  376. But no more Titan IV flights than Shuttle flights. Each load going
  377. up on a Titan will save the taxpayers half a billion $$. Now
  378. if we wanted to add some risk we could build HL Delta. Each load
  379. on this vehicle will save the taxpayers about 1.1 billion $$.
  380. (HL Delta wold be better than Titan V because it would reduce the
  381. risk of having all launchers grounded at the same time).
  382.  
  383. >The ELV industry does not have that capacity
  384. >right now, would require them to change gear.   
  385.  
  386. We can launch six Titan IV's per year from pad 41 at the Cape.
  387. Each Titan launch can carry as much as the shuttle which only
  388. flies about four times a year. This means we have 50% more
  389. Titan capacity than Shuttle capacity. 
  390.  
  391. Pad 40 could with modification also launch 6 Titan's per year.
  392. giving us three times the Titan capacity as Shuttle capacity.
  393.  
  394. >But could save
  395. >$$$.    Will need to redesign all the Freedom launch packages
  396. >however, big cost and schedule hit at this stage in the program.
  397.  
  398. It's going to happen. This years Freedom appropriation will force
  399. NASA to do just that.
  400.  
  401. > + The Earth Station already has an airlock and facilities for
  402. >+EVA.
  403. >I do not mean the Earth station, I mean your mysterious "Delta-
  404. >launched" manned spacecraft will have to be designed to support
  405. >EVA in order to assemble the Earth station in the event the Earth
  406. >Station fails to deploy automatically.    That makes the Delta-
  407. >spacecraft expensive.   More than the entire HLV, to put it in
  408. >perspective.
  409.  
  410. Do it with a Soyuz. They can be bought for 1/6 the cost of the
  411. ACRV and we can do EVA from it.
  412.  
  413. >+ They already have. The House Senate Conference put back the DoE
  414. >+ IR&D money. Some of this money will go to the Great Exploration
  415. >+ for A detaild study. After that, there is good reason to expect
  416. >+ them to start in earnest. This probram has the support of the
  417. >+ Space Council (Quale recently told the head of LLNL that he
  418. >+ wanted to see this program move forward).
  419. >I am delighted.   I just hope Quayle and the congress won't be
  420. >too disappointed when they see the cost projections escalate
  421. >and/or the schedule start slipping, happens to everybody sooner
  422. >or later.
  423.  
  424. Not everybody (see Boeing). I hope you won't be too disappointed if
  425. it works.
  426.  
  427. >+I would like to see a reason more detailed. What specific
  428. >+engineering problems are there?
  429. >I do not know.   That is the problem in itself.  They express
  430. >extraordinary optimism about an unknown quantity.
  431.  
  432. No more optimism than the engineers of Apollo. 
  433.  
  434. > > >>Any of those guys coming to southern California any time soon?
  435.  
  436. > > >+ Invite them down
  437.  
  438. > > >Hah !  I value my job too much.
  439.  
  440. > >+ That's an interesting remark. Why would inviting some
  441. >+ speakers in get you fired?
  442.  
  443. >>I work for a Freedom contractor.    LLNL represents the competition.
  444.  
  445. >+ Now that is another interesting remark. I routinely visit and
  446. >+look at the work of my competition. I want to know what they are
  447. >+ up to and if they have any good ideas.+
  448. >+  Why are your bosses so afraid of evaluating the competition?
  449.  
  450. >We are of course VERY interested in the competition.   My concern
  451. >is giving competitiors visibility of our status, and providing
  452. >them a forum.   Meeting on neutral turf is AOK, which is why I
  453. >ask: are they coming to So Cal.
  454.  
  455. They already have a forum in the Senate, on the Space Council,
  456. and other places. Besides, why does giving them a forum bother you?
  457. If you are correct in what you say won't you win the arguement?
  458.  
  459. >   Also, my competitors do net give me the same access to their
  460. >facilities as yours do !
  461.  
  462. Sure they do. Don't you go to trade shows or read your competitors research
  463. papers?
  464.  
  465.   Allen
  466.  
  467. -- 
  468. +-------------------------------------------------------------------------+
  469. | Allen W. Sherzer      |         What should man do but dare?            |
  470. |   aws@iti.org         |             - Sir Gawain                        |
  471. +-------------------------------------------------------------------------+
  472.  
  473. ------------------------------
  474.  
  475. End of SPACE Digest V12 #520
  476. *******************
  477.